Place of Origin:
Guangdong, China (Mainland)
Brand Name:
PARKOO
Certification:
CE, EMC, GS, RoHS, SASO, UL, UR, CCC
Model Number:
CF7.5SD
Contact Us
1. Functions
2. Parameters
Article No. | CF7.5SD |
Article Name | Industrial Dehumidifier |
Dehumidify Capacity | 7.5 L/HOUR |
Applying Area(with three meters height) | 200~250M2 |
Voltage | 380V/50Hz |
Rated Input Power | 2200W |
Maximum Power | 2700W |
Air Circulation | 1200M3/H |
G.W.(KG) | 128KG |
TIPS
Many raw materials and products in the warehouse can not be affected by moisture, which will lead to the deterioration of product quality and bring unnecessary economic losses to the enterprise. Therefore, the warehouse has high requirements for air humidity.The traditional way is to control the humidity through ventilation, placing hygroscopic agent and other ways, but these ways are inefficient and consume human and material resources.Now more enterprises are configured in the warehouse industrial dehumidifier to moisture-proof control.
When using the dehumidifier, you should set the humidity value of the dehumidifier according to the storage.Different materials are not the same degree of damp, some in the air humidity 80% will be damp, and some in 60% of the time there will be damp performance.Generally, the air humidity can be set at about 50%, but some sensitive and delicate things need to be set at a lower humidity.
1. Can you customize the product?
Yes, we can customize any products according to customer's requirements.
2. Which payment terms are you doing?
L/C, T/T, (100% payment in advance.)
3. Which shipment is available?
By sea, by air, by express or as your requirement.
4. Are you a factory or trading company?
We are a factory which specialized in produce dehumidifier about 13years.
5. How long is the warranty period for the product?
We provide 1-year warranty for our products.
6. Do you accept OEM or ODM?
Yes, we do. We sincerely welcomed.
7. Can I buy 1 or 2 pieces of samples for testing before bulk order?
Yes, we are pleased to send you samples for the quality and performance test.
8.What about the delivery date?
If we have free stocks of the item you need, it can be sent within 1 week after receiving deposit or 100% payment into our bank account.If we don't have free stock, the delivery date can be different for different products. Generally speaking, it will take 35 to 45days.
Send your inquiry directly to us